Paul Teutul Sr. from American Chopper will be attending NPE 2009

by AaronEquipmentCo16. June 2009 13:47
Paul Teutel Sr. from American Chopper Fame Will Make an Appearance at the NPE Show. Paul Teutul Sr. from the hit T.V. show American Chopper will make a personal appearance at Aaron Equipment Company’s Booth #N83031 at the NPE 2009 Tradeshow at McCormick Place in Chicago. The “Aaron Bike” will be on display the entire week of the Show (June 22-26) and Paul Sr. will be signing autographs in person on Tuesday, June 23rd between 1-3 pm. Free Posters of the “Aaron Bike” will be available for autograph seekers. The “Aaron... [More]

“Aaron Bike” – Upcoming American Chopper Episode

by AaronEquipmentCo10. June 2009 13:49
Our very own American Chopper episode, “Aaron Bike” will be on the air this upcoming Monday, June 15th at 8:00pm CDT. Teaming up with Orange County Choppers’ famous Teutul family – Paul Sr. and sons Paul Jr. and Mikey – came as a natural fit for Aaron Equipment, since both companies develop innovative solutions for their customers, and both are family run. Check your local listings for upcoming channel.

NPE 2009 – The International Plastics Showcase

by AaronEquipmentCo3. June 2009 15:55
Aaron Equipment Company will be exhibiting at the NPE 2009 – The International Plastics Showcase from June 22-26, 2009 at Booth #N83031. NPE 2009 is located at McCormick Place in Chicago, IL. We will be presenting our “Aaron Bike” as built by Orange County Choppers. Paul Teutul Sr. from American Chopper, will be a guest in our booth on Tuesday, June 23rd.

Sizing a back-up / standby / emergency diesel or natural gas generator set

by AaronEquipmentCo3. June 2009 13:52
The first step would be to find out your required load. Contact your electricity supplier and ask them for a copy of your average load and peak load over the last 12 months. You should also know the Amps of your incoming service. Once you have the load information size the generator so the peak load is about 75% of your generator rated output. [More]

Generator Set Enclosures

by AaronEquipmentCo3. June 2009 13:40
If you are going to install a generator set outside your building you will need at least a weather protective or weather proof enclosure. The weather enclosure is designed to do exactly that keep the rain and snow out. Weather enclosures are typically used in industrial settings where there are no residential areas close by. [More]

New Diesel Generator Sets

by AaronEquipmentCo1. June 2009 13:54
Until recently larger diesel generator sets delivery time was as long as 12 months due to delivery of the engines. Engine availability is the key component in generator set lead time. Once the engine is on hand the entire generator set can be packaged / assembled typically in 1-2 weeks. For these reasons we decided to inventory a New 300kW diesel generator set New Cummins 300kW and a New Cummins 500kW diesel generator set New Cummins 500kW we also have a variety of engines 200kW and under in order to provide a quick turn around. [More]

Archives

Cash Icon
Surplus Equipment?

We pay "Top Dollar" for your idle process equipment! Fill out our form and our buying team will get back to you.

Sell Equipment
Search Icon
Browse Inventory

View our entire inventory process equipment inventory online or visit our location for an inspection.

View Inventory
Phone Icon
Contact us

Call us and speak with an equipment specialist to answer any questions you may have.

630-350-2200